问题 适用于变截面连续箱梁施工的方法有()
选项 A:顶推法 B:悬臂浇筑法 C:支架法 D:转体施工法 E:悬臂拼装法
答案 BCDE
解析 箱形预应力混凝土连续梁桥的施工方法很多,有:顶推法、悬臂浇筑法、支架法、转体施工法、悬臂拼装法等,而其中顶推法适用于等截面连续梁。

猜你喜欢

发表评论
更多 网友评论0 条评论)
暂无评论
错误啦!

错误信息

  • 消息: [程序异常] : MISCONF Redis is configured to save RDB snapshots, but it's currently unable to persist to disk. Commands that may modify the data set are disabled, because this instance is configured to report errors during writes if RDB snapshotting fails (stop-writes-on-bgsave-error option). Please check the Redis logs for details about the RDB error.