在明挖扩大基础施工过程中,如用机械开挖基坑,挖至坑底时,应保留不小于( )cm厚度的底层,在基础浇筑圬工前用人工挖至基底标高。A.10 B.20 ...

作者: rantiku 人气: - 评论: 0
问题 在明挖扩大基础施工过程中,如用机械开挖基坑,挖至坑底时,应保留不小于( )cm厚度的底层,在基础浇筑圬工前用人工挖至基底标高。
选项 A.10 B.20 C.30 D.50
答案 C
解析 如用机械开挖基坑,挖至坑底时,应保留不小于30cm厚度的底层,在基础浇筑圬工前用人工挖至基底标高。

猜你喜欢

发表评论
更多 网友评论0 条评论)
暂无评论
错误啦!

错误信息

  • 消息: [程序异常] : MISCONF Redis is configured to save RDB snapshots, but it's currently unable to persist to disk. Commands that may modify the data set are disabled, because this instance is configured to report errors during writes if RDB snapshotting fails (stop-writes-on-bgsave-error option). Please check the Redis logs for details about the RDB error.