某项目的净现金流量如下,使计算其投资回收期(){图}A:2 B:1.4 C:1.5 D:1.8

作者: tihaiku 人气: - 评论: 0
问题 某项目的净现金流量如下,使计算其投资回收期()
{图}
选项 A:2 B:1.4 C:1.5 D:1.8
答案 D
解析 根据题干表中的净现金流量可以求得累计净现金流量如下:

投资回收期=累计净现金流量开始出现正值年份数-1+上年累计净现金流量绝对值/当年净现金流量。投资回收期=2-1+50/60≈1.8(年)。

相关内容:目的,现金流量,如下,投资,回收期

发表评论
更多 网友评论0 条评论)
暂无评论
错误啦!

错误信息

  • 消息: [程序异常] : MISCONF Redis is configured to save RDB snapshots, but it's currently unable to persist to disk. Commands that may modify the data set are disabled, because this instance is configured to report errors during writes if RDB snapshotting fails (stop-writes-on-bgsave-error option). Please check the Redis logs for details about the RDB error.