问题 高压送电线路设计中,下面哪些要求是正确的? (
选项 A) 风速V≤20m/s,计算500kV杆塔荷载时,风荷载调整系数取1.00 (B) 风速20≤V<27m/s,计算500kV杆塔荷载时,风荷载调整系数取1.10 (C) 风速27≤V<31.5m/s,计算500kV杆塔荷载时,风荷载调整系数取1.20 (D) 风速V≥31.5m/s,计算500kV杆塔荷载时,风荷载调整系数取1.30
答案 BCD
解析 《110kV~750kV架空送电线路设计规范》10.1.18,表10.1.18-1

猜你喜欢

发表评论
更多 网友评论0 条评论)
暂无评论
错误啦!

错误信息

  • 消息: [程序异常] : MISCONF Redis is configured to save RDB snapshots, but it's currently unable to persist to disk. Commands that may modify the data set are disabled, because this instance is configured to report errors during writes if RDB snapshotting fails (stop-writes-on-bgsave-error option). Please check the Redis logs for details about the RDB error.